Page 82 - NUROL İNŞAAT TANITIM KATALOĞU EN
P. 82

Ashgabat National Institute for Manuscripts
                                                                   • Location: Ashgabat / TURKMENISTAN • Type of Work: Cultural
                                                                   Center (design and build) • Number of Floors: 4 • Construction Area:
                                                                   5,800 m² • The building houses a conference hall (in the basement
                                                                   floor) of 120 seating capacity, various laboratories, printing and
                                                                   workshop facilities, exhibition areas etc. It is equipped with latest
                                                                   technology  security  and  automation  systems.  The  project  was
                                                                   undertaken by a joint venture, where Nurol held 50% of shares.










          Ties Children Sanitation Complex
          • Location: Krasnoyarsk - Siberia / RUSSIA • Type of Work: Dormitories,
          sports facilities, relevant auxiliary facilities and infrastructure works •
          Closed Area: 39,155 m² • The complex, comprised of 15 blocks (15,500
           2
          m  in total), houses children’s dormitories, restaurant, health center,
          cultural center, and service buildings, as well a closed swimming pool
          complex that contains a semi-olympic pool in addition to a training
                                                            2
          pool. Furthermore, there is an individual sports hall with 1,800 m
          closed area. The project was undertaken by a joint venture of 50%
          Nurol ownership.






                                                                  Ashgabat Grand Turkmen Hotel

                                                                  • Location: Ashgabat / TURKMENISTAN • Type of Work: Hotel complex
                                                                  • Total Closed Area: 17,000 m² • Number of Rooms and Beds: 120
                                                                  rooms, 240 beds • The hotel, which was financed by Turkish Eximbank
                                                                  loans and designed as a five-star hotel, was constructed by the joint
                                                                  venture with 50 % Nurol share as two blocks of 6 floors and 10 floors
                                                                  respectively.










          Nefteyugansk Airport
          Terminal Building Project

          • Location: Nefteyugansk - Siberia / RUSSIA • Type of Work: Airport
          terminal buildings • Closed Area: 4,140 m² • The flight information
          system, cable channel TV and announcement systems and all other
          relevant systems of the building built at international standards by
          the Joint Venture with 50 % Nurol share, on turnkey basis.










          82 | Superstructure Projects
   77   78   79   80   81   82   83   84   85   86   87