Gebze-Orhangazi-İzmir Motorway, Balıkesir-Kırkağaç-Akhisar Section (Km: 224+300 - 317+284)

PROJECT NAME : Gebze-Orhangazi-İzmir Motorway, Balıkesir-Kırkağaç-Akhisar Section (Km: 224+300 - 317+284)
LOCATION : Balıkesir / TURKEY
TYPE OF THE WORK : 2x3 Lane Motorway
LENGTH OF THE
MOTORWAY : 93 km

DESCRIPTION
As per the implementation contract signed on 27 September 2010 between KGM and Otoyol Yatırım ve İşletme, that became effective on 15 March 2013 a total of 427 km of motorway was constructed between Gebze and İzmir. All works of Orhangazi Section 4, under the scope of said project, has been carried out by Nurol. The project’s scope includes construction of 93 km of motorway, 6 viaducts, 37 motorway bridges with precast beams, 75 underpasses, 224 box culverts, 6 retaining walls and 10 derivation channels. 21.200.000 m³ of motorway excavation, 7.600.000 m³ of borrow cut, 24.600.000 m³ of motorway fill, 900.000 m³ of concrete works, 2.944 pieces of precast beams and 19.642 m of bored pile works were carried out along with a total of 6.600.000 tons of superstructure. A total of 5 motorway service facilities as well as 5 interchanges connecting the main motorway to Balıkesir, Savaştepe, Soma, Kırkağaç, Akhisar were constructed within the scope of the project.
TOP