Eyiste Viaduct Project Contract has been signed between General Directorate of Highways and Nurol Construction and Trading Company. The project is a viaduct which shall be constructed in Hadim Valley between Konya – Alanya using balanced cantilever beam construction method. The viaduct will have 9 spans and total length of 1372 meters. The construction period
Turkey’s service exports champions were awarded within the scope of the “Turkey’s 500 Great Service Exporters” survey held for the first time this year by Turkish Exporters Assembly. Potential of the service sector was revealed in the organization joined by Prime Minister Binali Yıldırım with 10 ministers. According to survey results, Nurol Construction and Trading
The facing concrete pavement of the Ilısu Dam which is the vision project within the Southeastern Anatolia Project (SAP) run by the General Directorate of state hydraulic works under the Ministry of Forestry and Water Affairs was completed. Veysel Eroglu, the Minister of Forestry and Water Affairs, stated that the dam and HPP projects within
The Orhangazi Tunnel within the Gebze-Orhangazi-İzmir Highway Project was opened to traffic a short time ago. The highway will decrease air-pollution resulted due to the stop-and-go in traffic during the transitions between Orhangazi and Yalova, and decrease the traffic jam with time spent in traffic. The Samanlı mountain consisting an important part of the highway
Being one of the mega projects of the Turkish Rebuplic and the biggest build-operate-transfer project that puts a stamp on history “Gebze – Orhangazi – İzmir Project has been put into service on June 30th by President Recep Tayyip Erdoğan, Prime Minister Binali Yıldırım and Ahmet Arslan, Minister of Transport, Maritime Affairs and Communication.Connecting Izmit
The largest part of the Gebze-Orhangazi-Izmir motorway project, The Izmir Bay Crossing has been completed. The project will reduce the travel time between Istanbul and Izmir from 9 hours to 3,5 hours. The project listed as the 4th biggest suspension bridge with a tower height of 252 metres, deck width of 35,93 metres, 1,550 metre
The decks for the Izmit Bay Bridge, which was announced to be opened in May 2016 by the Minister of Transport, Maritime Affairs and Communications Binali Yıldırım, are being floored one after the other. So far 11, 300 tonne decks have been put into place. Thus a 275 metre section has been completed. The two
Governor İrfan Balkanlıoğlu issued statements about Ordu Peripheral Road, 3 312 meters long left tube and 3 308 meters long right tube, 6 621 meters in total. “The excavation and shoring work for Boztepe Tunnel has just been finished” said the Governor and reminded that there are 12 pedestrian crossings, 16 crossroads on the Blacksea
Mr. Enver Yılmaz, Ordu Metropolitan Municipality Mayor stated that the Ring Road Project which would be 19 km. was brought to the agenda due to the frequent traffic congestion in Ordu. He reminded that the project was tendered for 600 million TL, the studies on the project started in 2007 and its foundation was laid
The studies are ongoing in full swing on the İzmit Crossing Bridge of which completion has been planned in 2016. Fikri Işık, the Minister of Science, Industry and Technology and Mehmet Müezzinoğlu, the Minister of Health climbed to the tower of the suspended bridge of İzmit Crossing, at 252 meter high and reviewed thereof. Işık,