| PROJECT NAME | : | Ashgabad Olympic Stadium & Floored Parking Lot Project |
| LOCATION | : | Ashgabad / TURKMENISTAN |
| TYPE OF WORK | : | Stadium complex (design works included) |
| PROJECT AREA | : | 53.868 m² |
| CLOSED PARKING LOT | ||
| AREA | : | 37.600 m² |
| SPECTATOR CAPACITY | : | 30.000 |
DESCRIPTION |
||
| Within the project scope of the stadium complex that had athletics fields and steel structured tribune groups, a parking lot with 2 floors and 4 tennis courts were also included. The project was realized by the JV with 50 % Nurol share. | ||