Nurol Construction and Trading
CEO & Board Member
Nurettin AKDENİZ
Phone: +90 (212) 286 80 10
Email: info@nurolinsaat.com.tr
Nurol Construction and Trading Co. Inc.
Nurol Plaza Büyükdere Caddesi No: 255 Kat:19 34485 Maslak, Sarıyer / İstanbul - TURKEY
PROJECT NAME | : | Gebze-Orhangazi-İzmir Motorway, South Approach Viaduct Project |
LOCATION | : | Yalova / TURKEY |
TYPE OF WORK | : | Steel Viaduct |
LENGTH OF THE VIADUCT | : | 1.379 m |
WIDTH OF THE DECK | : | 36 m |
MAXIMUM PIER HEIGHT | : | 57 m |
NUMBER PIERS | : | 11 |
DESCRIPTION |
||
As per the implementation contract signed on 27 September 2010 between Directorate of State Highways and Otoyol Yatırım ve İşletme, that became effective on 15 March 2013 a total of 427 km of motorway will be constructed between Gebze and İzmir. All works of the South Approach Viaduct, under the scope of said project, were completed by Nurol. The scope of this project includes the complete construction of the South Approach Viaduct which comprises of a steel deck with a length of approximately 1.379 m, 11 steel piers and an abutment made of reinforced concrete. Project’s scope includes 43.500 m3 of concrete 32.000 tons of steel. |