Silvan Right Bank Gravity Main Canal – Section 1 Construction Works
| PROJECT NAME |
: |
Silvan Right Bank Gravity Main Canal – Section 1 Construction Works |
| LOCATION |
: |
Diyarbakır/Türkiye |
| TYPE OF WORK |
: |
Canal Construction |
| DESCRIPTION |
| The project has a total route length of 17.5 km. Within this scope, a total of 13,982 m of main canal construction will be executed. This includes an 817-m-long main transmission channel, a 12,625-m-long Right Bank Main Canal, and steel siphon structures with a total length of 540 m. These structures consist of six steel pipes, each with a diameter of 4 m. Additionally, seven twin-tube tunnels totaling 7,070 meters with a route length of 3,535 meters will be constructed. Each tunnel has an internal diameter of 7.1 meters. Twenty-nine structural works, including bridges and road crossings, will also be constructed. |