Works of Gebze – İzmir Highway Project which is the biggest in Europe and second biggest in the world continued substructure investment are continued on the final speed. Companies at the consortium which has been awarded at the tender of project for which it is assumed to have approximately 870 million TL savings are planned
First stage of tunnels of which construction is continued under the scope of “Ordu Ring Road Project” which is one of the most challenging sections of Öceli Tunnel Black Sea Coast Road was opened. Ordu 6.500 m long “Öceli Tunnel” which is the first stage and which is the most challenging part of Ring Road
Lütfi Elvan, Minister of Transportation, Maritime Affairs and Communication, made a speech at İstanbul – Bursa – İzmir Highway İzmit Gulf Bridge Leg Caisson Submerging Ceremony. In his speech, Elvan mentioned that an important progress has been realized under the scope of the Project and they shall connect both shores of Marmara to each other
The final version of the İzmit Bay Crossing Bridge, the various animation pictures of which have been published until now and which is the most important transit route of Gebze-Orhangazi-İzmir Highway that will reduce Istanbul-Izmir highway journey to 3.5 hours, has been shared in the internet upon its preparation by Highway Investment and Management Co.
Arınç, who took off from Istanbul Atatürk Airport together with the Governor Münir Karaoğlu and Ismail Kartal, the Bursa Regional Director of the Public-Private Sector Partnership under the General Directorate of Highways, analyzed some parts of the project studies related to Yalova including İzmit Bay Crossing and access roads. Examining the construction site and getting
50 percent of Samanlı Tunnel on the border of Yalova-Bursa, the construction of which continues within the scope of Gebze-Orhangazi-İzmir Highway Project, has been completed. Ismail Kartal, the Bursa Regional Director of the Public-Private Sector Partnership under the General Directorate of Highways, stated that 3 tunnels are to be constructed within the scope of the
The Ordu Freeway Project with a length of 19-kilometre, the foundation of which was laid in 2012 to be constructed, continues at full speed despite the occasional challenges stemming from the ground. In his statement to AA correspondent, the Governor of Ordu Kenan Çiftçi has said that the works required for the completion of Ordu
The works at Karsak Strait intersection, where one of the Orhangazi exits of Gebze-Orhangazi-İzmir highway whose construction is rapidly ongoing takes place, are feverishly continuing. In the intersection, which holds the distinction of being one of the biggest cloverleaf crossroads of Turkey, the filling works are about to be completed. There are two separate exit
The tube tunnel and 5 stations of Marmaray Project, which intends to integrate all rail systems in Istanbul with each other, were put into service with a ceremony held yesterday. The President Abdullah Gul, the Prime Minister Recep Tayyip Erdogan and the ministers as well as the President of Somali Hassan Sheikh Mahmud, Prime Minister
The caissons on which the footings of Izmit Gulf Crossing Bridge, which will reduce the passage between Istanbul to Yalova to 6 minutes, were launched to the sea in 350 metres off-shore. Each caisson prepared for the bridge which is the second biggest in Europe and fourth biggest in the World was designed to be