“Ümraniye – Ataşehir – Göztepe Metro Line” contract has been signed between İstanbul Municipality and Nurol’s Joint Venture on 14th of April 2017.
Project scope consists of 11 stations, 13 km long double TBM Tunnel, 2 train depots (NATM), and a connection tunnel (NATM). Supervision of maintenance and operation, preparation of operation and maintenance manuals, provision of spare parts and consumables and providing training for staff is also included in the scope.
The construction period will be 1020 days.
We wish that the project will serve our country in a best possible way.