Nurol Construction in Media
Training Protocol for Students of MCBU | Manisada Gündem / 19.07.2017
Tuesday, 23 January 2018
Manisa Celal Bayar University and Nurol İnşaat ve Ticaret A.Ş. signed a training protocol for students graduated from vocational schools. Manisa Celal Bayar University and Nurol inşaat ve Ticaret A.Ş. have signed the training protocol for employment of graduates from MCBU Vocational School, departments of Mining, Machinery and Borer in 2017 and the students with
No Comments
Ring Road’s Second Phase Awarded | Ordu Olay / 17.07.2017
Tuesday, 23 January 2018
Tender related to Second Phase of Ordu Ring Road was made by General Directorate of Highways. Tender awarded to Nurol-Yüksel Joint Venture, who has also been awarded the first phase of Ordu Ring Road, with a price approximately 550 million liras. Second phase, having a length of 10,5 km, of Ordu Rİng Road whose total
96% of Ilısu Dam and HEPP Completed | Tigris Haber / 12.06.2017
Tuesday, 23 January 2018
96% of Ilısu Dam and Hydroelectric Power Plant (HEPP), the world’s largest dam in terms of body volume and crest length in the category of rock-filled dams with concrete-filled profile and the vision project, built by General Directorate of State Hydraulic Works, has been completed. The rotor weighing 460 tons, one of the most important
Pride Day of Turkish Contractors | Eko Vitrin / 01.03.2017
Tuesday, 23 January 2018
Turkish companies which have entered the list of the world’s largest contractors, received their awards from President Erdogan. Among the companies which have been awarded with “Overseas Contracting Services Award” are the construction giants such as Doğuş Construction, Polimeks, Çalık, TAV, Limak, Nurol, Enka NATA and Rönesans.
Ilısu: A Contribution to National Economy | Ticari Hayat / 20.01.2017
Tuesday, 23 January 2018
Veysel Eroğlu, Minister of Forestry and Water Management, declared that with a total cost of 1 billion euro Ilısu Dam and Hydroelectrical Powerplant will contribute the national economy around 1.3 billion Turkish Lira per year just from the power generation. In his declaration Minister Eroğlu pointed out that Ilısu Dam and Power Plant is one
Nurol Construction and Trade Inc. had a hand in the “Full support for Education” campaign in Artvin | Dost Artvin / 12.01.2017
Tuesday, 23 January 2018
The additional protocol was signed for the Arhavi Imam-Hatip Secondary School and High School was started to be built by the Nurol Construction and Trade Inc. within the “Full support for Education” campaign in Arhavi. The protocol regarding to the Arhavi Imam-hatip Secondary School having 12 classes and High School having 10 classes, was signed
Konya-Alanya will Last 2 Hours | Yeni Konya / 22.12.2016
Tuesday, 23 January 2018
Excavation process at Eyiste Viaduct, which decreases the journey time between Konya and Alanya to 2 hours, will begin at April. Taking the tender over the authorities of Nurol Construction visited Ahmet Hadimioğlu, the Mayor of Hadim to give information. The company executive said that site mobilisation works have been commenced. Mayor Hadimioğlu stated: “This
4000 People will be Deployed at Ilısu Dam | Güneş / 28.11.2016
Tuesday, 23 January 2018
Having the longest crest and the largest concrete-covered frontageis of the world, located within the borders of Mardin and Şırnak, the fourth biggest dam of Turkey due to its power generation capacity, Ilısu Dam will be a life line for the region. The construction of the Ilısu Dam and Powerplant has commenced 10 years ago
An Invitation to Schools from Museum of Technology | Gebze / 18.11.2016
Tuesday, 23 January 2018
The industry museum opened within Oksijen AVM situated near Osmangazi Körfez Access Bridge established with Otoyol A.Ş. at the Dilovası pillar, is being an attraction center every passing day. In the middle of the two storeyed technology museum based on 350 square meters is located a similar model of the bridge. The museum also displays
The Ilısu Dam will be ready for waterholding in 7 months | Dünya / 04.11.2016
Friday, 04 November 2016
The facing concrete pavement of the Ilısu Dam which is the vision project within the Southeastern Anatolia Project (SAP) run by the General Directorate of state hydraulic works under the Ministry of Forestry and Water Affairs was completed. Veysel Eroglu, the Minister of Forestry and Water Affairs, stated that the dam and HPP projects within