THE FIRST PHASE OF THE PERIPHERIC ROAD IS INAUGREE | KARADENİZ GÜNDEM / MARCH 05, 2019

After the meeting of President Erdogan in Ordu, the Ministry of Transport and Infrastructure, Mehmet Cahit Turan, and the Director General of Highways, Abdulkadir Uraoglu, inaugurated the first phase of the direct link with Erdogan. minutes. During the preparation of the Black Sea coastal road project in 1994, in the center of the town of Ordu Altinordu, it was requested 5 km from the city center passage to fill up. The inhabitants of Ordu opposed the transition project of the city and organized walks of people. The project was abandoned and various projects were prepared on the Kumbaşı-Boztepe-Karapınar road. The tender for the motorway was laid in July 2012. The first stage of the road, with a total length of 21.4 km, 10.4 km kilometers of landslides, which occurred in the 500 meters of the landslide disrupted the work. A total of 75 kilometers of bored piles were taken in the area to prevent landslides. The first leg of the Ordu ring road, which cost about 1.9 billion lire, has been completed.